| Commit message (Collapse) | Author | Age | Files | Lines |
|
|
|
| |
Notes:
svn path=/head/; revision=48566
|
|
|
|
|
|
|
|
|
| |
even a whole month might be missing.
This caused a bug for the LN -calender, whose switch was
on Dec 12, 9999.
Notes:
svn path=/head/; revision=45064
|
|
|
|
|
|
|
|
|
| |
PR: 6394
Reviewed by: phk
Submitted by: Josh Gilliam <josh@quick.net>
Notes:
svn path=/head/; revision=35458
|
|
|
|
| |
Notes:
svn path=/head/; revision=34801
|
|
|
|
|
|
|
|
| |
Synchronize usage message with man page.
PR: bin/5488
Notes:
svn path=/head/; revision=32525
|
|
|
|
| |
Notes:
svn path=/head/; revision=32460
|
|
|
|
| |
Notes:
svn path=/head/; revision=32310
|
|
|
|
|
|
|
|
|
|
|
| |
Gregorian Reformation. E. G. in Albania December 1, 1912 doesn't exist.
2. Add some countries in the switch table (BE, FI, LN, LU)
3. Correct some entries from the new found source of calendar knowledge:
http://www.pip.dknet.dk/~c-t/calendar.html,
That is Claus Tondering's Calendar FAQ.
Notes:
svn path=/head/; revision=32282
|
|
|
|
|
|
|
|
| |
Localize formatting of date of easter.
Suggested by: ache
Notes:
svn path=/head/; revision=32215
|
|
|
|
|
|
|
| |
and invoked as "cal").
Notes:
svn path=/head/; revision=32139
|
|
|
|
| |
Notes:
svn path=/head/; revision=31868
|
|
Notes:
svn path=/cvs2svn/branches/HELBIG/; revision=31744
|