aboutsummaryrefslogtreecommitdiff
path: root/devel/tdl
diff options
context:
space:
mode:
authorPete Fritchman <petef@FreeBSD.org>2004-08-06 15:07:40 +0000
committerPete Fritchman <petef@FreeBSD.org>2004-08-06 15:07:40 +0000
commite64d9607bdee4446ffdb646c028006823d1aa405 (patch)
tree8c630865811ea5e614ed0cf7a86e6a87395820b4 /devel/tdl
parente24e361f545108952c127a6418980b5f7a269396 (diff)
downloadports-e64d9607bdee4446ffdb646c028006823d1aa405.tar.gz
ports-e64d9607bdee4446ffdb646c028006823d1aa405.zip
- update to 1.5.2
- new MASTER_SITES/WWW: - fmt pkg-descr PR: 68814 Submitted by: Alex Kapranoff <kappa@rambler-co.ru>
Notes
Notes: svn path=/head/; revision=115511
Diffstat (limited to 'devel/tdl')
-rw-r--r--devel/tdl/Makefile4
-rw-r--r--devel/tdl/distinfo4
-rw-r--r--devel/tdl/pkg-descr11
3 files changed, 10 insertions, 9 deletions
diff --git a/devel/tdl/Makefile b/devel/tdl/Makefile
index 0d1a1f5e9c8e..f27a84a930eb 100644
--- a/devel/tdl/Makefile
+++ b/devel/tdl/Makefile
@@ -6,9 +6,9 @@
#
PORTNAME= tdl
-PORTVERSION= 1.4.1
+PORTVERSION= 1.5.2
CATEGORIES= devel
-MASTER_SITES= http://www.rrbcurnow.freeuk.com/tdl/
+MASTER_SITES= http://www.rpcurnow.force9.co.uk/tdl/
MAINTAINER= petef@FreeBSD.org
COMMENT= To-do list manager
diff --git a/devel/tdl/distinfo b/devel/tdl/distinfo
index 68eeba90d6de..d5df880d9b58 100644
--- a/devel/tdl/distinfo
+++ b/devel/tdl/distinfo
@@ -1,2 +1,2 @@
-MD5 (tdl-1.4.1.tar.gz) = 298b5ac103e6d3cadfdbcd046a6745a9
-SIZE (tdl-1.4.1.tar.gz) = 65292
+MD5 (tdl-1.5.2.tar.gz) = 620cb00bf99b7e786e2b54cda6339a1e
+SIZE (tdl-1.5.2.tar.gz) = 66057
diff --git a/devel/tdl/pkg-descr b/devel/tdl/pkg-descr
index 6b8c2900a821..04c1a4054bc5 100644
--- a/devel/tdl/pkg-descr
+++ b/devel/tdl/pkg-descr
@@ -1,9 +1,10 @@
-A small program for managing a to-do list. There can be one to-do database
-per directory, or per tree of directories. Tasks are in a tree structure
-(ie: one task can be a sub-task of another task). Reports can also be
-generated to summarize tasks completed in a certain time period.
+A small program for managing a to-do list. There can be one to-do
+database per directory, or per tree of directories. Tasks are in
+a tree structure (ie: one task can be a sub-task of another task).
+Reports can also be generated to summarize tasks completed in
+a certain time period.
-WWW: http://www.rrbcurnow.freeuk.com/tdl/
+WWW: http://www.rc0.org.uk/tdl/
- Pete
petef@FreeBSD.org